This site is a static rendering of the Trac instance that was used by R7RS-WG1 for its work on R7RS-small (PDF), which was ratified in 2013. For more information, see Home. For a version of this page that may be more recent, see WorkingGroupOneProcess in WG2's repo for R7RS-large.

Working­Group­One­Process

alexshinn
2010-03-11 15:11:48
1history
source

This is a rough outline of the process for Working Group 1, leading up to the first public draft milestone:

For voting we will use a preferential voting mechanism, so that any number of proposals can be made without detracting from each other or forcing an all-or-nothing situation. The exact method remains to be decided, but will likely be either ranked pairs or Schultz. In addition to winning the vote, any deviation from R5RS must beat the R5RS option by a minimum percentage, yet to be decided but likely in the 75-90% range.

Details and an example vote to be posted soon.

The hope is that with this system and a more or less balanced representation of Scheme implementations and ideals among the members, we can ensure that while nothing crazy gets added, any feature that is almost universally desired _will_ get accepted, even if we can't agree on all the details.

Overall it's important that Working Group 1 err on the side of conservatism, to ensure a wider acceptance among implementations than R6RS received. It's harder to remove features than to add them, and we have Working Group 2 to add any extra features necessary.